top of page

Rigid | Red Iron Steel Building Solutions

Traditional Red Iron heavy gauge columns and rafters

Contact us today to start a design and get a free estimate

Metal Buildings

​Framing Specs and Details:

  • Primary Framing: Welded I-Beams, Tapered Columns, Red Iron, Built Up

  • Secondary Framing: Cold Formed 12 - 16 ga CEE & ZEE

  • Connections: All Bolts

  • Bay Spacing: 15' - 30' | Depending Loads Usually Wider than Cold Formed Framing

  • Bracing: Cable & Rod X Bracing

  • Anchor Bolts: Wet-Set J Anchors (Not Included) 

  • Interior Look: Larger Framing | Red Iron Framing

  • Concrete: Foundation (Footer, Stem Wall, Slab) | Larger Point Loads than Cold Form Framing Require more Concrete

  • Delivery: Longer Lead Times (10-12 Weeks in Production)

Cold Formed Bolt-Up Steel Building Solutions

Amazing Option in the Steel Building industry

Economical, Efficient, and Effective with Design Flexibility

Spans 12' to 80' Clear or 120' Posted (Pending Loads)

steel metal buildings

​Framing Specs and Details:

  • Primary Framing: Bolted CEE Channels (12-16 ga), Straight Columns, Galvanized, Lighter Gauge Cold Formed

  • Secondary Framing: Cold Formed 12 - 16 ga CEE & ZEE

  • Connections: All Bolts

  • Bay Spacing: 10' - 25' | Depending Loads Usually Spaced Closer than Red Iron Framing

  • Bracing: Strapping

  • Anchor Bolts: Screw Down Bolts (Included) 

  • Interior Look: Smaller Framing Members w/ Cleaner Lines | Galvanized Framing

  • Concrete: Monolithic Slab Foundation | Smaller Point Loads than Red Iron Framing Requires Less Concrete

  • Delivery: Shorter Lead Times (4-6 Weeks in Production)

bottom of page