Call 1-800-326-7608
Rigid | Red Iron Steel Building Solutions
Traditional Red Iron heavy gauge columns and rafters
Contact us today to start a design and get a free estimate
Framing Specs and Details:
-
Primary Framing: Welded I-Beams, Tapered Columns, Red Iron, Built Up
-
Secondary Framing: Cold Formed 12 - 16 ga CEE & ZEE
-
Connections: All Bolts
-
Bay Spacing: 15' - 30' | Depending Loads Usually Wider than Cold Formed Framing
-
Bracing: Cable & Rod X Bracing
-
Anchor Bolts: Wet-Set J Anchors (Not Included)
-
Interior Look: Larger Framing | Red Iron Framing
-
Concrete: Foundation (Footer, Stem Wall, Slab) | Larger Point Loads than Cold Form Framing Require more Concrete
-
Delivery: Longer Lead Times (10-12 Weeks in Production)
Cold Formed Bolt-Up Steel Building Solutions
Amazing Option in the Steel Building industry
Economical, Efficient, and Effective with Design Flexibility
Spans 12' to 80' Clear or 120' Posted (Pending Loads)
Framing Specs and Details:
-
Primary Framing: Bolted CEE Channels (12-16 ga), Straight Columns, Galvanized, Lighter Gauge Cold Formed
-
Secondary Framing: Cold Formed 12 - 16 ga CEE & ZEE
-
Connections: All Bolts
-
Bay Spacing: 10' - 25' | Depending Loads Usually Spaced Closer than Red Iron Framing
-
Bracing: Strapping
-
Anchor Bolts: Screw Down Bolts (Included)
-
Interior Look: Smaller Framing Members w/ Cleaner Lines | Galvanized Framing
-
Concrete: Monolithic Slab Foundation | Smaller Point Loads than Red Iron Framing Requires Less Concrete
-
Delivery: Shorter Lead Times (4-6 Weeks in Production)